La Route Zagreb - Split

 
Since the end of June 2003, visitors to Croatia traveling by car to the coast can get to their destinations faster and easier. The first sections of the new motorways that are being built according to the Government's intensive motorway plan, decided upon in 2001, have been opened. In order to get to your destination easier and faster, find out the sections' names and when they were opened. We urge you to pay special attention to critical points.
 
 
The most important section is definitely the one leading towards the south. The Gornja Ploca-Zadar II along with the recently built Udbina-Gornja Ploca state road makes traveling from Zagreb to Zadar 90 minutes shorter. The most significant part of this section is 5.670 meter long Sv. Rok tunnel. Two other sections on the Rijeka-Zagreb and Zagreb-Split motorways (Vukova Gorica-Bosiljevo I and Bosiljevo I - Mala Kapela) have also been opened, totaling 46 km.

With the opening for traffic of the Mala Kapela tunnel and the final section from Vrpolje to Pirovac which is 33 Kilometres in length, the Zagreb – Split highway was officially opened on Sunday the 26th of June. The newly opened Zagreb – Split highway, with a total length of 380 kilometres, now connects the north and south of Croatia by a 3 1 hour drive and costs a total of 157 Kuna in road-tolls.

Highway toll is paid according to the length of highway section and according to type of vehicle. Toll can be paid in tollbooths in cash, via credit cards (AMERICAN EXPRESS, DINERS, MASTER CARD, MAESTRO, VISA), or citizen's checks. The smallest amount per check is 10,00 KN. Toll can also be paid in foreign currency according to the exchange rate list of PBZ established on the day of paying.

A1 HIGHWAY: ZAGREB - SPLIT
VUKOVA GORICA - BOSILJEVO 1 SECTION
Length of the Vukova Gorica-Boslijevo I Section amounts to 6,15 km
and was opened on 29.06.2003.

BOSILJEVO I - TUNEL MALA KAPELA SECTION
Length of the Bosiljevo I-Josip dol - Mala Kapela tunnel Section amounts to approximately 36 km and was opened on 30.06.2003.

GORNJA PLOCA-ZADAR II SECTION
Length of the Gornja Ploca-Zadar II Section amounts to 59,8km
and was opened on 30.06.2003.


MOTORWAY CRITICAL POINTS - ZAGREB-SPLIT:
The critical point is Sv. Rok tunnel, where the road is two-lane, meaning that it changes from a four-lane motorway to a two-lane semi-motorway, having one lane for each direction. After exiting the southern side of Sv. Rok tunnel, there are some 4 kilometers of straight road towards Maslenica. After exiting Celinka tunnel (third in a row when traveling from Zagreb), there is a large curve and afterwards (after two kilometers and Baricevic viaduct) a sharp right curve. From Sv. Rok tunnel to the sharp curve after Baricevic viaduct, the speed limit is 80 kilometers per hour. We urge drivers to obey the speed limit not only due to the road configuration but also due to strong and sudden winds (Bura wind) common in the area.


plus INFORMATION :
A map of Croatia's motorway network can be found at www.mppv.hr .

 
  

Touriste Info  
Offre de logement
Amusements  
Gastronomie  
Vacances actives  
Tips & Info  
 
L'information générale
Circulation
La Route
L'argent
Le soin de Santé
Vacances
Événements
Pélerinages
Télécommunications
Nombres importants
 
Publicité  
 
Copyright 2005 - 2006© Zaton-Online
Home Forum Impresum Contact
Designed & developed by Marijan Milošević